JBA were appointed as Design Consultant for the extension and refurbishment of a 4* Hotel in Mayfair.
Read MoreStrip-Out in Peckham
Much of the dry lining and finishes were removed from the property back in September to allow the building to 'dry out' after several decades of sub-division, limited use and poor maintenance, which had degraded the structure to some extent.
Read More